Concrete Plant

Meier Betonwerke GmbH

For the energy-intensive concrete production at Meier Betonwerke GmbH, an efficient and sustainable solution was needed to reduce on-site energy and grid costs while making optimal use of both existing and planned energy generation.


Client: 

  • Meier Betonwerke GmbH 
  • Segment: Concrete Production

Installer: 

​Client: 

  • Lauterhofen, Germany

Existing Assets: 

  • PV system: 750 kW


Implemented Solution: 

  • FENECON Industrial L
  • Power: 1500 kW
  • Capacity: 4072 kWh


Conclusion:


The energy storage system helps to smooth peak demand and significantly increase the self-consumption of the existing photovoltaic systems, which currently have a capacity of 750 kW. At the same time, the storage system enables flexible participation in the energy market. It actively charges when electricity prices are at their lowest, storing energy for later use.


Conclusion: 

The Industrial XL is flexibly designed to support future applications such as targeted grid usage at defined times or “behind-the-meter” integration into virtual power plants, making it well prepared for the Energy Journey of Meier Betonwerke GmbH.