The Next Mobility Hub in Passau represents the “fuel station” of the future: the site offers customers a range of energy solutions – from EV charging for passenger cars and trucks to conventional fuel and hydrogen for heavy-duty transport.
The goal was to identify a solution that optimizes energy consumption at the site while simultaneously avoiding the need for costly grid expansion.

Client:
- Maier & Korduletsch Unternehmensgruppe
- Segment: Operators of fuel and charging infrastructure
Installer:
- Bachner Group
Location:
- Passau, Germany
Requirements:
- High power output for fast-charging infrastructure
- Grid-supportive operation
- Cost-effectiveness
- Future-proof, scalable solution
- Outdoor-capable system
Existing Assets:
- Electric fast-charging park (12 fast-charging points)
- Hydrogen fueling station for heavy-duty transport (including hydrogen compressor)
- conventional refueling facilities
Implemented Solution:
- 2x FENECON Industrial L
- Power: 2x736 kW
- Capacity: 2x 1288
Results:
Grid expansion avoided through intelligent peak shaving.
Reliable operation of 12 fast-charging points, even at high utilization levels.
Integration of e-mobility, hydrogen, and conventional fuels into a grid-supportive overall system.
Conclusion:
By deploying two FENECON Industrial L energy storage systems, a state-of-the-art and scalable mobility hub was realized. The intelligent energy management system increases on-site consumption, reduces grid load, enables high charging capacities, and creates the foundation for additional revenue streams through energy trading.